[Date Prev][Date Next][Thread Prev][Thread Next][Date Index][Thread Index]
[BLDG-SIM] Process Loads
DOE-2 has refrigerated case equipment models which will do just what
you want. You specify a nominal sensible and latent load for up to
three different types of cases (each type can have a different
setpoint and compressor efficiency) and the loads are adjusted as the
temperature and humidity change in the space. You can also specify
auxiliaries and defrost controls.
On 30 Aug 2001, at 14:27, RMalcolm@xxxxxxxxxxxxxxxxx wrote:
>
> I have a DOE question for you. If I wanted to simulate the energy
> consumption of a building that have negative process load, could I input a
> negative process load to be considered in the buildings load calc? Maybe
> there is a way to create a lighting system with negative wattage that
> operates 24 hours per day or what ever the equivalent of the process load
> is.
>
> I am asking because I am trying to simulate a supermarket which has reduced
> cooling load because the refrigeration systems provide cooling that is not
> seen by the HVAC system.
>
> Anyway, let me know what you think.
>
>
> ======================================================
> You received this e-mail because you are subscribed
> to the BLDG-SIM@xxxxxxxx mailing list. To unsubscribe
> from this mailing list send a blank message to
> BLDG-SIM-UNSUBSCRIBE@xxxxxxxx
>
========================================================
Michael J. Witte mjwitte@xxxxxxxx
GARD Analytics, Inc. www.gard.com
1028 Busse Highway Phone 847-698-5685
Park Ridge, Illinois 60068-1802 FAX 847-698-5600
USA Energy, Environmental and Economic Research
======================================================
You received this e-mail because you are subscribed
to the BLDG-SIM@xxxxxxxx mailing list. To unsubscribe
from this mailing list send a blank message to
BLDG-SIM-UNSUBSCRIBE@xxxxxxxx