|
We
tried scheduling the outdoor air fraction in the Systems component of the
DOE2.1E program by using the occupancy schedule in the Loads
component. This would vary the outdoor air based on
occupancy using CO2 sensors in the Return Air. However the schedule
overrode the air-side economizer. Can this problem be fixed in
DOE2.1E?
Varkie
Thomas
=====================================================You received this e-mail because you are subscribed to the BLDG-SIM@xxxxxxxx mailing list. To unsubscribe from this mailing list send a blank message to BLDG-SIM-UNSUBSCRIBE@xxxxxxxx |